Hand Winch
Tools · Saltlight Harbour
€7,00



Drag to orbit · scroll to zoom
A low-poly gangplank to bridge the gap between a quay and a moored boat. The grey board ramp is crossed by evenly spaced cleats for footing, and a rope handline runs along one side on three slim dark posts. The context render shows it laid on a small sandy shore. It is a single piece of 400 triangles, 3.00 m long and 0.61 m wide, made for Saltlight Harbour.
Gangplank: a single soft low-poly gradient asset from Saltlight Harbour, the Saltlight waterfront in soft low-poly: piers and quays on a 2 m grid, rowboats to a sailing ferry, fishing gear, a boatyard and the lighthouse, all on one shared gradient atlas.
€180 charged annually. Plan allowances apply.
Your download link arrives by email right after checkout. Standard license.
What the Premade3D Standard License covers
One license per creator. Read the full license
Bundle it
Also in Docks & Quays Kit: 12 assets worth €74,00 separately, yours for €30,00.
Tools · Saltlight Harbour
€7,00
Tools · Saltlight Harbour
€4,00
Props · Saltlight Harbour
€7,00
Architecture · Saltlight Harbour
€12,00
Architecture · Saltlight Harbour
€12,00
Vehicles · Saltlight Harbour
€19,00